Whitburn - outside view of brick and glass building
Close-up of Building showing brickwork and 6 windows
Interior of the building under construction with exposed steel columns
Interior with open plan and large windows
Interior with wooden partitions
Hanging lights from a wooden panelled ceiling
White coated walls in a hallway
Wood reception area closer view
Wood reception area and seating
Wooden floor and white shelving units against the walls
Larger view of a wooden floored room with variety of shelving and
black metal railing around a stairway looking up to next floor
hallway with rooms to the side with black framed glass doors
narrow corridor with 3 doors to rooms and a ladder from the roof for access to the above flooor
Kitchen with units built in and water tap
Upper landing from the stair with a door leading to a lift
previous arrow
next arrow
Slider

Project: Whitburn Partnership Centre which included

  • manufacture timber kit on site
  • roofworks
  • mf ceilings
  • supaslat ceilings
  • partitions
  • joinerwork finishings (doors, facings, skirtings and ironmongery)
  • kitchen installation

Anchorpoint Interiors logo

Project: Ascensos in Motherwell. A completed fit-out with suspended ceilings, partitions, joinerwork and ceiling baffles.


Project: District 10 in Dundee for Maxi Construction which included forming roof, fitting external windows, roughing out old shipping containers by forming floors, ceiling and walls and finishing by fitting doors, ironmongery, skirtings and kitchens.


Project: City Of Edinburgh Methodist Church for Robertson Construction which included refurbishment. Form all floors, ceilings, partitions and roofs. Fit all doors and ironmongery. Repair pews.


project management and construction ltd

Project: Community Centre, New Build in Cairnryan for Project Management and Construction Limited. Erect, rough and finish timber kit.


hadden construction

Project: Sheltered Housing for Hadden Construction Group in East Campbell Street, Glasgow. Refurbish 48 flats.